About us

About Bluewave

The company started its activity in 1993 specializing in all concrete works, all integrated finishes, destinations, works, landscape and swimming pools.

Proceeding from the company’s plan to provide distinguished services to its esteemed clients looking for luxury, beauty, and quality, we decided from the beginning ….

  • First: To be dedicated and mastered our work to the fullest.
  • Second: Depending on premium equipment, guaranteed in terms of high performance and safety .
  • Third: It is the most important dependence in the implementation of the work on specialized engineers, technicians and trained workers at the highest level.
  • Fourthly: Last but not least, the company is distinguished by providing the most appropriate prices while maintaining the achievement of the equation of excellence, the high level, and the standard implementation time.

OUR CLIENTS

client 8
client 10
client 11
client 12
client 7
mazaya
client 2
client 3
client 4
concord
client 6

Company’s business precedent

The company aimed from the beginning to spread among the customer audience by exploiting the good reputation, which has already been formed over the years thanks to excellence in implementation and commitment to the business schedule and modernization and continuous development and keenness toa satisfy customers and make them feel comfortable and constant with the continuous service to them during and after implementation and this of course with prices that are not compared with experience and reputation in the field of specializing of the company.

The company thanks all its customers who have placed their trust in it.

Egyptian-Chinese University El zatoun
(owner of the International Educational Foundation).

Concrete works and integrated interior and exterior finishes (white oyster – Gibson board – paints – facades) and all electromechanical works for each of the following buildings:

  • The terrace building includes 2 small runways with a capacity of 500 students, a large amphitheater with a capacity of 1,500 students and drawing halls on an area of 3000 m2 (steel structure ).
  • The senior management building on an area of 1500 m2 consisting of ground and 3 bis.
  • The workshop building of the Engineering College 700m2.
  • factory building on an area of 700m2
  • The faculty of physiotherapy building consists of ground and 2 recurrent on an area of 1900m2.
  • Scanon building on an area of 1200m2.
  • The work of the public site includes all the entire infra-structure works and paving works and roads.
  • Fire tank with a capacity of 450 m3.
  • Modern International School of The First Assembly, concrete works, finishes, electromechanical works and coverwork from steel to semi-Olympic swimming pool.

Mazaya Gift & Perfume Company.

  • Beauty business sector on 90 north street in front of Petrosport Stadium with a length of 480 m (settlement works, printed concrete, landscape and mazaya sign).
  • Integrated maintenance works for Mazaya stores (Moods- Okaidi- Tally- Mazaya- Parfois-Etam-Bejou), which includes electricity works, air conditioning, paints, carpentry and all that is needed.

Ascanta

The work of electromechanical for a semi-Olympic swimming pool and a children’s bath at the Youth Center of the Al-Hamoul Sports Club and an integrated heating system (natural gas – diesel).

The construction of a swimming pool covered underground and the work of Khoazig supported by a margin of 7 meters from zero level underground in the palace of Mr. Ayman Al-Ashri zamalek Hassan Sabri Street.

Swimming pool works and Land Scape M. Consultant / Tariq Abdel-Rady, located as a Uptown Cairo compound.

Comprehensive integrated finishing works (electrical works – plumbing – paints – motel – shish mat – marble – carpentry doors – security glass for consultations and handler ladders – destinations – landscape) in villa M. – Hisham Ahmed Darwish Bellagio Village Villa No. (S204)

Concrete and electromechanical works for a semi-Olympic bathroom in the Village of Journalists, North Coast.

Establishing a swimming pool in Abdeen villa with a surface of 400 square meters in Maadi St. No. 18 Villa 21.

Establishing a 300m2 swimming pool for Villa No. 23, Line 3, North Orabi Association.

Create a swimming pool, Mustafa Draz villa located in Choueifat district, Fifth District, New Cairo.

The swimming pool of the villa of Mr. Hicham Mekkawi, located in Katameya Heights.

Swimming pool for the villa of Mr. Yasser Abdel Quddus.

Establishing the swimming pool for the villa of Major General Saleh Al-Husseini, located in Al-Obour City, 6th District.

The architecture of the consultant / Maher Baybars, Governor of Beni Suef, located on 155 Maadi Street, and this includes the construction of 4 swimming pools in the basement, after the work of piles, support and drilling, with an area of ​​3000 m 2.

Amending and raising the efficiency of the private pool of Mrs. Dina Antoine, Mirage City.

Establishing a swimming pool in Villa Safwat Hammad, located on the 3rd line south of Ahmed Orabi Association.

Laguna Bay Al Ain Al-Sukhna
(owner of Capital Developments).

  • Concrete works, regular works and facades for both

1 – 170 shawl.
2 – Village Mosque.
3 – Village Wall

  • Concrete works, business routines and electromechanical works of each.

1 – Pool on an area of 672 m2.
2 – Swimming pool on an area of 580 m2.
3 – Number 1 fountain at the entrance of the village on an area of 66 m2.

  • The work of the public site includes

1 – Landscape works and cultivation on an area of 2700 m2, including the works of nigella, sieves, trees, flowers and irrigation networks around the pool.
2 – Concrete works printed on an area of 3000m2.

7) Dr. Walid Dabis Modern Academy’s owner.

  • Works of concrete and electromechanical and finishes for the swimming pool of Villa D/ Walid in the village of Stella de Mare in El Ain Al-Sukhna, Filtrion Unit,820 m2.
  • Works of concrete, electromechanical and finishes for the British School’s Olympic Swimming Poolfiltrion unit .
  • Upgrading of private swimming pools at the Royal School and the French School and the supply and installation ofFILTRION UNIT.
  • Concrete works, electromechanical and finishes for the pool of Villa D/ Walid in uptown Cairo village at the 1200m2 skimmer entrance.

Administrative capital.

Concrete and integrated regular works for the number of 7 buildings is ground and 8 repeated with an area of 700 m2.

The building of M/ Anwar al-Abd, located on 12 Sarayat Al-Maadi Street, includes the work of al-Khoazig, Al-Sind and excavations with an area of 1000 m2.

Apartment finishing works submitted by / Tamer and head of Mokattam Traffic Unit.

Comprehensive integrated finishes works (electrical, plumbing, paints, motel, shish mat, marble, carpentry, doors, security glass for consultations, handler ladders, destinations, landscape) at the villa of Talal Al-Shawarbi No. (21Deblo) in the northern coast, Mountain View Village.

Mountain View Village 1 & 2, number 168, private pool of the village villas, New Cairo.

Concrete and electromechanical works for the swimming pool. Half of the Olympic Club of the former Egyptian American Bank, Credit Agricole is currently.

Create a swimming pool, Adel Draz villa, located in Choueifat, Fifth District, New Cairo.

Create a swimming pool, Villa Bahaa Sabry, located in Bazon 10 Katameya Heights.

The concrete works for the villa of Mr. Eng. Nabil Al-Malti + the swimming pool works for the villa.

The swimming pool of Mr. Tariq Mohammed’s villa.

Acts of raising the efficiency of the swimming pool for the Civil Workers Club.

Establishing a swimming pool and private lakes in the villa of Mr. Mohamed Al Ali, located in the Saudi Egyptian Company, Fifth Settlement.

Establishing a swimming pool in Villa No. 526, El Shaboury, located in El Katameya Heights.

Amer Group and Troubi Tu.

  • Concrete works and electromechanical works for the Porto Matrouh swimming pool group (4 swimming pools area 235 m2 and 4 swimming pools area 29 m2) horizon system.
  • Concrete works and electromechanical works for the pool group of HAND2 Porto Sokhna (main bathroom area 235 m2 and children’s bath area 29 m2) filtrion unit system.

Concord Paradise.

  • Concrete works and integrated interior and exterior finishes for 20 villa.
  • Concrete works and finishes integrated interior and exterior finishes for the entire Concorde.
  • Concrete works and electromechanical works for the Olmebe and Jakozi bath and children’s bath at the village club.
  • Concrete works, finishes and electromechanical works for 3 industrial lakes with total sizes of 2970 m2.
  • Digging, destroying, settlements, concrete and stacking the villas of the engineer/Ahmed abdul-managed managing director and 7 villas.
  • Digging, destroying, settlements, concrete and stacking the villas of the engineer / Ahmed Suleiman, chairman of the board of directors of concord village and numbering 3 villas.
  • The work of concrete, finishes and the work of electromechanical for a semi-Olympic bath suspended in the third floor above the squash court of the Black Pool Club, the largest squash complex in the Middle East, Asba and Jacozi.
  • The work of concretes, finishes and electromechanical works for 25 villas swimming pools within the village with different areas ranging from 40 m2: 70 m2 in all systems such as HorizonPool – Over Flow Pool -Filtrion Unit Pool – Skimmer Pool.

Create a swimming pool, Ashraf Draz villa located in Choueifat district, Fifth District, New Cairo.

Construction of a swimming pool in Ahmed Azou Villa Mirage City.

The group of works of Eng. Khaled Al Adham, they are 17 villas + swimming pools for the villas.

The work of raising the efficiency and ramping up the swimming pool of Mr. Omar Shalbaya villa in Maadi.

Create a private pool for Villa Sherine Hassouna, Mirage City.

Construction of a swimming pool in the villa of Mr. Yasser Qamar, located in the village of Concord Paradise.

Villa Al-Wakeel Ashraf No. (162B), Dyar Compound, Fifth Settlement, steel structure works, to provide it with a role, integrated finishes and facades.

Special finishing works for villa D / A supervisor in Ain El Sokhna.

Comprehensive integrated finishes works (electrical, plumbing, paints, motel, shish mat, marble, carpentry, doors, securit glass for consultations, and Hendrel Ladder, destinations, land scape) at Villa Mohamed Ahmed Abdel Rahman El-Gohary No. (Samos41) in the northern coast, Mountain View Village.

Comprehensive integrated finishes works (electrical, plumbing, paints, motel, shish mat, marble, carpentry, doors, securit glass for consultations, and Hendrel Ladder, destinations, land scape) at Villa Tariq Darwish No. (Curvo36) in the northern coast, Mountain View Village.

Establishing a private pool for Villa No. 1 in the suburb of Palm Shorouk, the flat area of ​​the bathroom is 500 m 2.

Construction of a 300 m² flat swimming pool, concrete works for Villa No. 30, Line 3, north of Ahmed Orabi Association.

In addition to some maintenance contracts for swimming pools

Lakes in the village of Concord in Fifth Avenue

Al-Hamoul Youth Sports Center.

Future University (Villa 11 Concord Village + Compounds Rd. 85 Maadi 7 bathrooms).

Petronas Corporation.

Civil workers In El-Manial.

South Beach, Ain Sokhna.

Asec For Cement Company

Future university.

Kafr El Sheikh Sports Center.

1035
Completed Project
1124
Active Experts
833
Happy Clients
538
Developer Hand