
About Bluewave
The company began its activity in 1993, specializing in all concrete works, all integrated finishing works, destination works, landscaping works, and swimming pools. Based on the company’s plan to provide distinguished services to its valued customers looking for luxury, beauty and quality, we decided from the beginnin
- First: We must be dedicated and master our work to the fullest extent. Second: Relying on distinguished equipment guaranteed in terms of high performance and safety. Third: It is most important to rely on specialized engineers, technicians and workers trained at the highest level in carrying out the work. Fourth: Last but not least, the company is distinguished by providing the most appropriate prices while maintaining the equation of excellence, high level, and standard implementation time
The company’s previous work
From the beginning, the company aimed to spread among the customer audience by taking advantage of the good reputation, which has already been built up over the years thanks to excellence in implementation, commitment to the work schedule, continuous modernization and development, and keenness to satisfy customers and make them feel comfortable and always reassured with continuous service to them during and after implementation, and this, of course, with incomparable prices and with experience and reputation in the company’s field of specializationThe company thanks all its customers who have placed their trust in it
Egyptian Chinese University in Zaytoun (Al-Malik International Educational Foundation).
Concrete works and integrated interior and exterior finishing works (shell white – Gibson board – paints – facades) and all electromechanical works for each of the following buildings: –The auditorium building includes two small auditoriums with a capacity of 500 students, a large auditorium with a capacity of 1,500 students, and drawing halls on an area of 3000 square meters (steel structure).
The senior administration building covers an area of 1500 square meters, consisting of a ground floor and 3 floors.
The workshop building for the Faculty of Engineering is located on an area of 700 square meters.
Laboratory building on an area of 700 square meters
The Faculty of Physiotherapy building covers an area of 1900 square meters, consisting of a ground floor and 2 basements.
The housing building covers an area of 1200 square meters.
General site works, including all infra-structure works, paving and road works.
Fire tank with a capacity of 450 m3.
Modern International School in the First Settlement, concrete and finishing works, electromechanical works, and steel covering works for a semi-Olympic swimming pool.
Mazaya Gifts and Perfumes Company
Beautification works on the section on North 90th Street in front of Petrosport Stadium, with a length of 480 meters (leveling works, printed concrete, landscape, and a Mazaya sign).
Integrated maintenance work for Mazaya stores (Moods – Okaidi – Tally – Mazaya – Parfois – Etam – Bejou), which includes electrical work, air conditioning, painting, carpentry, and everything necessary
Laguna Bay Village, Ain Sokhna (owner, Capital Developments)
Concrete works, regular works and facades for everyone1 – 170 chalets.
2 – Village Mosque.
3 – The village wall
Concrete works, regular works, and electromechanical works for each.
1 – A swimming pool with an area of 672 m2.
2 – A swimming pool with an area of 580 square meters.
3 – One fountain at the entrance to the village, on an area of 66 square metres.
General site works include the following
1 – Landscape and agricultural works on an area of 2700 square meters, including grass, palm trees, trees, flowers, and an irrigation network around the swimming pool.
2 – Stamped concrete works on an area of 3000 square metres.
Amer Group and Truby2
Concrete and electromechanical works for a group of swimming pools for the Porto Matrouh project (4 swimming pools, area 235 m2 and 4 swimming pools, area 29 m2) with the Horizon system.Concrete and electromechanical works for the swimming pool group for the HAND2 Porto Sokhna project (main bathroom, area of 235 m2 and children’s pool, area of 29 m2) with the Filtrion Unit system.
Concord Paradise Company
Concrete works and integrated interior and exterior finishes for 20 villas.Concrete works and integrated interior and exterior finishing works for the entire Concord Mall.
Concrete works and electromechanical works for an Olympic pool, a jacuzzi, and a children’s pool in the village club.
Concrete, finishing and electromechanical works for 3 artificial lakes with a total area of 2970 m2.
Excavation, compaction, leveling, concrete and backfilling of the villas belonging to Engineer/Ahmed Al-Abd, Managing Director, numbering 7 villas.
Excavation, compaction, leveling, concrete and backfilling of the villas belonging to Engineer/Ahmed Al-Abd, Managing Director, numbering 7 villas.
Excavating, compacting, leveling, concreting and backfilling the villas belonging to Engineer/Ahmed Suleiman, Chairman of the Board of Directors of Concord Village, which number 3 villas.
Concrete, finishing and electromechanical works for a semi-Olympic bathroom suspended on the third floor above the squash court at the Black Ball Club, the largest squash complex in the Middle East, the spa and the jacuzzi.
Concrete, finishing and electromechanical works for 25 swimming pools for villas within the village with different areas ranging from 40 m2 to 70 m2 with all systems such as (Horizon Pool – Over Flow Pool – Filtrion Unit Pool – Skimmer Pool).
Dr. Walid Dabas, owner of Modern Academy
Concrete, electromechanical and finishing works for the private swimming pool of Dr. Walid’s villa in Stella Di Mare village in Ain Sokhna with the Filtrion Unit system, with an area of 820 m2.Concrete, electromechanical and finishing works for the British School’s Olympic swimming pool using the Filtrion Unit system.
Works to raise the efficiency of swimming pools for the Royal School and the French School, and the supply and installation of FILTRION UNIT.
Concrete, electromechanical and finishing works for the private swimming pool of Dr. Walid’s villa in uptown Cairo at the entrance to Mokattam, with an area of 1200 square meters with the Skimmer system.
Mazaya Gifts and Perfumes Company
Beautification works on the section on North 90th Street in front of Petrosport Stadium, with a length of 480 meters (leveling works, printed concrete, landscape, and a Mazaya sign).Integrated maintenance work for Mazaya stores (Moods – Okaidi – Tally – Mazaya – Parfois – Etam – Bejou), which includes electrical work, air conditioning, painting, carpentry, and everything necessary.
Administrative Capital
Concrete and regular integrated works for 7 buildings, including ground floor and 8 high-rise buildings, with an area of 700 square meters.Ascanta Company
– Electromechanical works for a semi-Olympic swimming pool and a children’s pool at the Hamoul Sports Club Youth Center and an integrated heating system (with natural gas and diesel).– Constructing a covered underground swimming pool and creating supporting piles with a 7-meter difference from the zero level underground in the private palace of Mr. Ayman Al-Ashry in Zamalek, Hassan Sabry Street.
– Swimming pool and landscape works, consultant/Tarek Abdel Rady, located in Uptown Cairo.
Comprehensive finishing works (electrical works, plumbing, paints, furniture, shutter mats, marble, carpentry doors, Securit glass for showers and ladder handles, facades, and landscape) in Villa M. Hisham Ahmed Darwish, Bellagio Village, Villa No. (S204).
Concrete and electromechanical works for a semi-Olympic swimming pool in Al Sahafiyeen Village on the North Coast.
– Construction of a swimming pool in Abdeen Villa, with an area of 400 square meters, in Maadi, Street No. 18, Villa 21.
– Construction of a swimming pool with a surface area of 300 square meters for Villa No. 23, Line 3, north of the Orabi Association.
– The private swimming pool of Mr. Hisham Makkawi’s villa, located in Katameya Heights.
– The private swimming pool of Mr. Yasser Abdel Quddus’ villa.
– Construction of the private swimming pool for Major General Saleh Al-Husseini’s villa, located in Obour City, Sixth District.
– The building of the consultant / Maher Baybars, Governor of Beni Suef, located on 155 Maadi Street. This includes the construction of 4 swimming pools in the basement after piling, support and excavation work, with an area of 3000 square meters.
– Modification work and upgrading the efficiency of Mrs. Dina Antoine’s swimming pool in Mirage City.
– Construction of a swimming pool in Safwat Hammad Villa, located on Line 3 South, Ahmed Orabi Association.
Finishing work for the apartment of Colonel / Tamer Wali and the head of the Mokattam Traffic Unit.
Integrated finishing works, including (electrical works, plumbing, paints, metal, shutter mats, marble, carpentry doors, Securit glass for showers and ladder handles, facades, and landscape) in the villa of Talal Al-Shawarbi consultant No. (21 Deblo) on the North Coast, Mountain View village.
Mountain View Village 1 & 2 has 168 private swimming pools in the village villas in New Cairo.
Concrete works and electromechanical works for the semi-Olympic swimming pool of the Egyptian American Bank Club, formerly Credit Agricole, currently.
Construction of a swimming pool for Adel Daraz’s villa, located in the Choueifat district, Fifth Settlement, New Cairo.
Construction of a swimming pool for Bahaa Sabry’s villa, located in Zone 10, Katameya Heights.
Concrete works for the villa of Mr. Engineer Nabil Al Malti + works for the villa’s swimming pool.
The private swimming pool of Mr. Tariq Muhammad’s villa.
Works to raise the efficiency of the Civilian Workers Club’s swimming pool.
Construction of a private swimming pool and lakes for the villa of Mr. Mohamed Al Ali, located in the Saudi Egyptian Company, Fifth Settlement.
Construction of a swimming pool in Villa No. 526, Villa Al-Shabouri, located in Katameya Heights.
Construction of a swimming pool in Ahmed Ezzo’s villa, Mirage City.
A collection of the works of Mr. Engineer Khaled Al-Adham, numbering 17 villas + the villas’ swimming pools.
Works to raise the efficiency and heighten the swimming pool of Mr. Omar Shelbaya’s villa in Maadi.
Construction of a private swimming pool for Sherine Hassouna’s villa in Mirage City.
Construction of a swimming pool in Mr. Yasser Qamar’s villa located in Concord Paradise Village.
Agent Ashraf’s villa No. (162B), Diyar Compound, Fifth Settlement, steel structure work to raise floors, integrated finishing works and facades.
Special finishing works for Villa Dr. A. Mosharafa in Ain Sokhna.
Integrated finishing works, including (electrical works, plumbing, paints, metal, shutter mats, marble, carpentry doors, Securit glass for showers and ladder handles, facades, and landscape) in the villa of Mohamed Ahmed Abdel Rahman El Gohary No. (Samos 41) on the North Coast, Mountain View Village.
Comprehensive finishing works (electrical works, plumbing, paints, metal, shutter mats, marble, carpentry doors, Securit glass for showers and ladder handles, facades, and landscape) in Dr. Tareq Darwish’s villa No. (Curvo36) on the North Coast, Mountain View village.
Construction of a private swimming pool for Villa No. 1 in the Nakheel suburb of Shorouk, bathroom area 500 square meters.
Construction of a swimming pool with a surface area of 300 m2. Concrete works for Villa No. 30, Line 3 North, Ahmed Orabi Association.
In addition to some swimming pool maintenance contracts
Future University.
Kafr El Sheikh Youth Sports Center.
Petronas company.
Civil Workers Club in Manial.
South Beach Village in Ain Sokhna.
Lakes in Concord Village, Fifth Settlement.
Al Hamoul Youth Sports Center.
Future University (Villa 11, Concord Village + compound, 85 Maadi Street, 7 bathrooms).














